You are here: :Home > About WXXF > Chronicle of Events > Content
Chronicle of Events
In 2016 our company was merged with Shandong Longquan Pipeline Engineering Co. Ltd. And we got Provincial Certificate of High and New Technology Enterprise.
In 2015 all staff in our company got trained about nuclear safety culture.
In 2014 our company obtained API QI Certificate and ASME Certificate
In 2013 our company renewed Certificate of High and New Technology Enterprise.
In 2012 our company was rated as Provincial Enterprise Technology Center by Enterprise Technology Center
Mar. 2011 Our new plant was put into use. Our company was moved to No.136 Zhenhu Road, Xituo Zone, Hudai Industrial Park, Binhu District.
Oct. 2010 Our registered capital was increased to 75 million RMB and our company’s name was changed into Wuxi Xinfeng Pipe-fittings Corp. Our company has become a municipal-level technical center.
2009 Our Strategic expansion led to the construction of a new plant with a coverage of 100 mu (66.7 thousand m²).
2008 We passed final appraisal from National Nuclear Safety Committee and obtained manufacturing license of civil nuclear mechanical equipment of nuclear level 1,2,3.
2007 We researched and developed carbon steel seamless elbow for main steam pipe (ø813*40, nuclear level 2)
2006 Our registered capital was increased to 38.58 million RMB. A second workshop was newly built.
2005 We acquired ISO9001:2000 Quality System Certificate issued by BV Certification Corporation,and PED (Pressure Equipment Directive) product certificate.
2002 We were rated as High-tech Enterprise by Jiangsu Scientific and Technological Committee.
2001 We were renamed as Wuxi Xinfeng Pipe-fittings Co. Ltd after reform.
2000 We obtained Manufacturing License of Pressure Pipeline Components issued by State Bureau of Technical Supervision.
1999 Obtained ISO9002:1994 Quality Assurance System Certification
May 1996 We obtained manufacturing license of nuclear pressure equipment, researched and developed nuclear submarine pipeline joints, and successfully solved the problems of ail leak, water leak and oil leak, which had puzzled the navy for many years.
1995 We developed nuclear-level pipe-fittings for nuclear power station.
July 1988 Wuxi Xinfeng Petrochemical Pipe-fittings Factory was founded.
This article Total1Page Current for the first1Page
【Bookmark this page】【Print】